Update – 2023 Alleyway Asphalt Mill & Overlay Project

Attention Lyon’s Gate Residents,

We would like to thank our membership for patience and cooperation during the first phase of our asphalt project that was just completed on February 27, 2023. As you know, we started the second phase of the project and unfortunately, encountered some unforeseeable challenges that halted the ability to have the project completed as planned.

The challenges encountered are associated with the subgrade in two (2) alleyways that will require an asphalt stabilization be performed prior to completing the repaving. The unanticipated additional step relating to the asphalt stabilization along with the current weather conditions have forced the paving of all areas to be rescheduled. The new proposed dates will be communicated to membership as soon as

the vendor has confirmed dates.

We have a few isolated alleyways in the western segment of the community in which the original scope included the stabilization scheduled to open TOMORROW, MARCH 16TH AFTER 12 PM.

We DO have an extended closure due to the stabilization that will impact twelve homes situated along the alleyway located between Shannon St. & Dublin St. east of Reseda St.

The new closure has been EXTENDED TO FRIDAY, MARCH 17TH BY 5 PM. The extended closure is necessary for the contractor to create accessibility for vehicular traffic safety and additional enforcement material.           

(SEE IMAGE BELOW FOR MAP DETAILS IN ATTACHMENT)

THIS IS THE ONLY ALLEYWAY THAT WILL BE IMPACTED BY THE EXTENDED CLOSURE NOTED ABOVE.

ADDITIONAL INFORMATION ON SECOND PAGE

PLEASE BE AWARE:

  • Vehicular traffic will NOT be permitted within the impacted alleyways during the work (see sequencing map for residences that will experience the extended closure). This restriction is related to the alleyways ONLY. Parking and access to the home fronts will be permitted at all times throughout the project.
  • A flyer will be taped to all impacted garage doors (painters’ tape to be used) for the homes that will be impacted by the extended closure. Management will also publish communication (flyer notice) via Village Connection and via emails of residents (for those that may not be registered to receive Village Connection notifications). Phone calls will also be made by the Management team.
  • Portions of this project will produce noise pollution in the surrounding areas where work is being performed.
  • As a reminder, the dates are tentative, weather permitting. In the event of any schedule change or any unforeseeable circumstance, a flyer will be posted on your unit with up-to-date information.
  • If you encounter any crew members and/or equipment near your home blocking access to a driving area during an emergency circumstance, please politely contact the crew.

Please note that this project has not been finalized, cleaning of driveway aprons and any other areas will addressed upon completion of the full project.

We encourage our residents to visit our Association platforms for updated project details. You may visit lyonsgate.nabrnetwork.com (for those residents that are registered for use) or https://livelyonsgate.com/.

We appreciate your patience and collaboration during this project and your understanding of any challenges experienced. If you have any questions, concerns and/or need to consult with our on-site project manager pertaining to this project, please contact your Lyon’s Gate Management Team.

Lyon’s Gate Management Team may be reached at lyonsgate@brownmanagement.com

Assistant Manager, Kathy Dunkel – Direct: 480-339-8831

General Manager, Marlen Rasmussen – Direct: 480 339-8832

 

Share This...